Internet based construction PROJECT quality management system

S. Thomas Ng*, R. Martin Skitmore

*Corresponding author for this work

Research output: Chapter in Book/Report/Conference proceedingConference contributionResearchpeer-review

1 Citation (Scopus)

Abstract

Quality management (QM) systems have been developed and used by many in the construction industry to ensure right things are done and things are done right the first time. However, current quality systems are designed to monitor and control the "production process" of a specific organization, with the QM data being revealed to the accreditation bodies during the auditing process only. As great deal of data is captured during the QM implementation, and much of this data is related to a construction project involving a multitude of stakeholders, there is a potential to convert the project-specific quality data (collected at an organizational level) into useful information for exploitation by other relevant project participants. The development of an Integrative Project-oriented QM (IPQM) system for construction would satisfy the stringent requirements of client satisfaction and continuous improvement as required by ISO9000:2000. In view of the fragmented nature of the construction industry, a tool that could facilitate easy communication of QM data between different participants is inevitable. The development of Internet technologies may open up new ways to ensure QM data is efficiently and securely transmitted. This paper provides a conceptual framework and prototype decision model for such an IPQM system.

Original languageEnglish
Title of host publicationEuropean and Mediterranean Conference on Information Systems (EMCIS) 2005 Proceedings
Publication statusPublished - 2005
Externally publishedYes
Event2nd European and Mediterranean Conference on Information Systems, EMCIS 2005 - Cairo, Egypt
Duration: 7 Jun 20058 Jun 2005

Conference

Conference2nd European and Mediterranean Conference on Information Systems, EMCIS 2005
Country/TerritoryEgypt
CityCairo
Period7/06/058/06/05

Fingerprint

Dive into the research topics of 'Internet based construction PROJECT quality management system'. Together they form a unique fingerprint.

Cite this