Improving tolerance control on modular construction project with 3d laser scanning and bim: A case study of removable floodwall project

Huimin Li, Chengyi Zhang*, Siyuan Song, Sevilay Demirkesen, Ruidong Chang

*Corresponding author for this work

Research output: Contribution to journalArticleResearchpeer-review

39 Citations (Scopus)

Fingerprint

Dive into the research topics of 'Improving tolerance control on modular construction project with 3d laser scanning and bim: A case study of removable floodwall project'. Together they form a unique fingerprint.

Engineering & Materials Science

Physics & Astronomy

Chemical Compounds