T1 - Identification of Risk Factors Affecting PPP Waste-to-Energy Incineration Projects in China: A Multiple Case Study
AU - Liu, Yong
AU - Sun, Chenjunyan
AU - Xia, Bo
AU - Liu, Sai
AU - Skitmore, Martin
N1 - Funding Information:
(is work was supported by the National Natural Science Foundation of China (NSFC) (Grant no. 71672180) and in part by Grant nos. 71471166 and 71501142, the Soft Science Research Program of Zhejiang Province (2016C35007), and the Zhejiang Provincial Key Research Institute of Philosophy and Social Sciences for Ecological Civilization (Grant no. 17STYB05).
Publisher Copyright:
© 2018 Yong Liu et al.
Copyright:
Copyright 2018 Elsevier B.V., All rights reserved.
PY - 2018
Y1 - 2018
N2 - Waste-to-energy (WTE) incineration technologies are considered an effective solution for sustainable and efficient municipal solid waste (MSW) disposal in China, and the public-private partnership (PPP) arrangement has been widely used to construct and operate WTE incineration projects. However, PPP WTE incineration projects in China are affected by numerous risks due to the long concession period, various participants, and other factors commonly involved in PPPs, resulting in a number of failures. In light of the pivotal role that risk identification, analysis, and response play in the successful development of PPP WTE incineration projects, this paper presents a multiple case study to identify the risk factors involved in China by drawing on experience from the real-life risk events of 35 PPP WTE incineration plants. 18 risk factors are identified; the most critical of which being public opposition risk, environmental pollution risk, government decision-making risk, a defective legal and regulatory system, and MSW supply risk. The results of the study provide a solid foundation for the future risk analysis, risk allocation, and risk response of PPP WTE incineration projects, and shed light on performance improvement of the PPP WTE incineration projects as well as the development of the PPP WTE industry in China.
AB - Waste-to-energy (WTE) incineration technologies are considered an effective solution for sustainable and efficient municipal solid waste (MSW) disposal in China, and the public-private partnership (PPP) arrangement has been widely used to construct and operate WTE incineration projects. However, PPP WTE incineration projects in China are affected by numerous risks due to the long concession period, various participants, and other factors commonly involved in PPPs, resulting in a number of failures. In light of the pivotal role that risk identification, analysis, and response play in the successful development of PPP WTE incineration projects, this paper presents a multiple case study to identify the risk factors involved in China by drawing on experience from the real-life risk events of 35 PPP WTE incineration plants. 18 risk factors are identified; the most critical of which being public opposition risk, environmental pollution risk, government decision-making risk, a defective legal and regulatory system, and MSW supply risk. The results of the study provide a solid foundation for the future risk analysis, risk allocation, and risk response of PPP WTE incineration projects, and shed light on performance improvement of the PPP WTE incineration projects as well as the development of the PPP WTE industry in China.
UR - http://www.scopus.com/inward/record.url?scp=85051580053&partnerID=8YFLogxK
U2 - 10.1155/2018/4983523
DO - 10.1155/2018/4983523
M3 - Article
AN - SCOPUS:85051580053
SN - 1687-8086
VL - 2018
JO - Advances in Civil Engineering
JF - Advances in Civil Engineering
M1 - 4983523
ER -