T1 - Explorations in specifying construction price forecast loss functions
AU - Skitmore, Martin
AU - Cheung, Franco K.T.
PY - 2007/5
Y1 - 2007/5
N2 - Typical measures of goodness of construction price forecasts are the mean and standard deviation, coefficient of variation and root mean square of the deviations between forecasted and actual values. This can only be valid, however, if the pain, or loss, incurred as a result of such deviations is directly proportional to the square of their value. Two approaches are used to test this. The first of these analyses 10 sets of data collected from around the world, while the second explores the use of a postal questionnaire survey to elicit construction industry client disutilities. The results of the first analysis mitigate against any general view that projects tend to be overestimated but do clearly suggest asymmetric under/overestimates for the measures used. The second analysis results in an approximated loss function although in ordinal terms only. This also suggests that the functional form varies between building types, with Commercial and Residential being the most asymmetric and Schools and Industrial being less asymmetric. The work to date indicates that, for construction price forecasting, the loss functions involved are asymmetric, with the degree of asymmetry increasing according to the level of commercial financial viability at stake.
AB - Typical measures of goodness of construction price forecasts are the mean and standard deviation, coefficient of variation and root mean square of the deviations between forecasted and actual values. This can only be valid, however, if the pain, or loss, incurred as a result of such deviations is directly proportional to the square of their value. Two approaches are used to test this. The first of these analyses 10 sets of data collected from around the world, while the second explores the use of a postal questionnaire survey to elicit construction industry client disutilities. The results of the first analysis mitigate against any general view that projects tend to be overestimated but do clearly suggest asymmetric under/overestimates for the measures used. The second analysis results in an approximated loss function although in ordinal terms only. This also suggests that the functional form varies between building types, with Commercial and Residential being the most asymmetric and Schools and Industrial being less asymmetric. The work to date indicates that, for construction price forecasting, the loss functions involved are asymmetric, with the degree of asymmetry increasing according to the level of commercial financial viability at stake.
UR - http://www.scopus.com/inward/record.url?scp=34249736376&partnerID=8YFLogxK
U2 - 10.1080/01446190600794571
DO - 10.1080/01446190600794571
M3 - Article
AN - SCOPUS:34249736376
SN - 0144-6193
VL - 25
SP - 449
EP - 465
JO - Construction Management and Economics
JF - Construction Management and Economics
IS - 5
ER -