Experiential learning in cost estimating

David Lowe, Martin Skitmore

Research output: Contribution to journalArticleResearchpeer-review

28 Citations (Scopus)
60 Downloads (Pure)

Abstract

This paper investigates experiential learning theory and the current perception of experiential factors in the accuracy of pre-tender cost prediction. It compares the preferred learning styles of a sample of experienced pretender cost estimators with those of novice quantity surveyors and investigates how estimators have developed as a result of their experiences. Experiential factors, those which stimulate personal development in pre-tender estimators, are considered and a mechanism to improve the accuracy of pre-tender estimates is proposed linking experiential learning theory with the introduction of feedback and self-monitoring systems.

Original languageEnglish
Pages (from-to)423-431
Number of pages9
JournalConstruction Management and Economics
Volume12
Issue number5
DOIs
Publication statusPublished - 1 Sept 1994
Externally publishedYes

Fingerprint

Dive into the research topics of 'Experiential learning in cost estimating'. Together they form a unique fingerprint.

Cite this