Abstract
Purpose
This paper aims to examine the use of the increasingly important virtual concept to deliver value in projects, focusing on the manifest, critical issues which can enhance value delivery in virtual construction projects.
Design/methodology/approach
The study uses both quantitative and qualitative triangulated methods to examine the concepts in the study. Triangulated data analysis is also used to give insight.
Findings
The study disentangles 16 manifest, independent variables as being crucial in enhancing value delivery in virtual construction projects. Also the research gives a fresh view, by differentiating between influential and necessary crucial variables in virtual construction project value delivery.
Research limitations/implications
The study demonstrates the use of triangulation in critical variables research. It also gives integrated insight on rigorous, triangulated, data analysis to enhance understanding in the critical variables research domain.
Practical implications
The research gives insight to managers on the issues which need attention in the design and implementation of virtual construction projects to deliver value.
Originality/value
The research adds value to the literature on the virtual construction project delivery concept, where little knowledge exists. Based on empirical evidence, the study also gives a fresh insightful lens, for the examination of critical variables from the perspective of influential and necessary items. © 2010 Emerald Group Publishing Limited.
This paper aims to examine the use of the increasingly important virtual concept to deliver value in projects, focusing on the manifest, critical issues which can enhance value delivery in virtual construction projects.
Design/methodology/approach
The study uses both quantitative and qualitative triangulated methods to examine the concepts in the study. Triangulated data analysis is also used to give insight.
Findings
The study disentangles 16 manifest, independent variables as being crucial in enhancing value delivery in virtual construction projects. Also the research gives a fresh view, by differentiating between influential and necessary crucial variables in virtual construction project value delivery.
Research limitations/implications
The study demonstrates the use of triangulation in critical variables research. It also gives integrated insight on rigorous, triangulated, data analysis to enhance understanding in the critical variables research domain.
Practical implications
The research gives insight to managers on the issues which need attention in the design and implementation of virtual construction projects to deliver value.
Originality/value
The research adds value to the literature on the virtual construction project delivery concept, where little knowledge exists. Based on empirical evidence, the study also gives a fresh insightful lens, for the examination of critical variables from the perspective of influential and necessary items. © 2010 Emerald Group Publishing Limited.
Original language | English |
---|---|
Pages (from-to) | 197-209 |
Number of pages | 13 |
Journal | Engineering, Construction and Architectural Management |
Volume | 17 |
Issue number | 2 |
DOIs | |
Publication status | Published - 1 Jan 2010 |
Externally published | Yes |