A framework for evaluating project managers' performance-identification and analysis of KPIs in subway construction projects in Tehran

Amir Naser Ghanbaripour, Parviz Ghoddousi, Ariyan Yousefi

Research output: Contribution to journalArticleResearchpeer-review

2 Citations (Scopus)
28 Downloads (Pure)

Abstract

One of the major issues for project management in a project environment such as subway construction project in Tehran, is the poor project management performance analysis. PM's performance plays a major role in the success of construction projects and the identification of proper Key Performance Indicators (KPIs) can lead the project to success. In spite of advances in project management, these indicators have not yet been identified for subway construction projects. This paper reports a research study that identifies the KPIs in Tehran subway construction projects and investigates their use as a tool for evaluating the project manager's performance.

Original languageEnglish
JournalIndian Journal of Science and Technology
Volume8
Issue number35
DOIs
Publication statusPublished - 1 Dec 2015
Externally publishedYes

Fingerprint

Subways
Managers
Project management

Cite this

@article{3de5fda0facd4194ab59127beb77055a,
title = "A framework for evaluating project managers' performance-identification and analysis of KPIs in subway construction projects in Tehran",
abstract = "One of the major issues for project management in a project environment such as subway construction project in Tehran, is the poor project management performance analysis. PM's performance plays a major role in the success of construction projects and the identification of proper Key Performance Indicators (KPIs) can lead the project to success. In spite of advances in project management, these indicators have not yet been identified for subway construction projects. This paper reports a research study that identifies the KPIs in Tehran subway construction projects and investigates their use as a tool for evaluating the project manager's performance.",
author = "Ghanbaripour, {Amir Naser} and Parviz Ghoddousi and Ariyan Yousefi",
year = "2015",
month = "12",
day = "1",
doi = "10.17485/ijst/2015/v8i35/87105",
language = "English",
volume = "8",
journal = "Indian Journal of Science and Technology",
issn = "0974-6846",
publisher = "Indian Society for Education and Environment",
number = "35",

}

A framework for evaluating project managers' performance-identification and analysis of KPIs in subway construction projects in Tehran. / Ghanbaripour, Amir Naser; Ghoddousi, Parviz; Yousefi, Ariyan.

In: Indian Journal of Science and Technology, Vol. 8, No. 35, 01.12.2015.

Research output: Contribution to journalArticleResearchpeer-review

TY - JOUR

T1 - A framework for evaluating project managers' performance-identification and analysis of KPIs in subway construction projects in Tehran

AU - Ghanbaripour, Amir Naser

AU - Ghoddousi, Parviz

AU - Yousefi, Ariyan

PY - 2015/12/1

Y1 - 2015/12/1

N2 - One of the major issues for project management in a project environment such as subway construction project in Tehran, is the poor project management performance analysis. PM's performance plays a major role in the success of construction projects and the identification of proper Key Performance Indicators (KPIs) can lead the project to success. In spite of advances in project management, these indicators have not yet been identified for subway construction projects. This paper reports a research study that identifies the KPIs in Tehran subway construction projects and investigates their use as a tool for evaluating the project manager's performance.

AB - One of the major issues for project management in a project environment such as subway construction project in Tehran, is the poor project management performance analysis. PM's performance plays a major role in the success of construction projects and the identification of proper Key Performance Indicators (KPIs) can lead the project to success. In spite of advances in project management, these indicators have not yet been identified for subway construction projects. This paper reports a research study that identifies the KPIs in Tehran subway construction projects and investigates their use as a tool for evaluating the project manager's performance.

UR - http://www.scopus.com/inward/record.url?scp=84962290664&partnerID=8YFLogxK

U2 - 10.17485/ijst/2015/v8i35/87105

DO - 10.17485/ijst/2015/v8i35/87105

M3 - Article

VL - 8

JO - Indian Journal of Science and Technology

JF - Indian Journal of Science and Technology

SN - 0974-6846

IS - 35

ER -